Building Defects in Queensland
The practical roadmap: builder notice, QBCC steps, QCAT, and when courts come in.

A brand-new ceiling leaking like a waterfall. Tiles popping up like they’ve got a mind of their own. A balcony that suddenly feels… bouncy. Not in a fun way.
This stuff is beyond annoying. It’s stressful. It’s expensive. And it messes with that basic feeling of “this place is safe”.
Now, here’s the deal in Queensland: defective building work isn’t just “bad luck”. There are rights, remedies, and a process. But… and it’s a big but… deadlines rule everything. Miss one and suddenly the leverage disappears.
And the kicker? A lot of people wait, thinking it’ll “settle” or the builder will just sort it. Then the deadline clock quietly keeps ticking in the background.
This is the practical roadmap: how Queensland usually expects this to be handled, what the QBCC can actually do, and when the dispute tends to move from “emails and site visits” into QCAT or court territory.
First question (and it’s not silly): is this a defect, or just something you hate looking at?
You know what’s interesting about building disputes? Two people can look at the same crack and have totally different reactions.
One says, “That’s normal settling.”
The other says, “That’s the start of a structural nightmare.”
Sometimes one of them is right. Sometimes both are half-right. And sometimes the contract and the standards guide decide the argument, not gut feelings.
Queensland disputes often turn on what’s considered acceptable workmanship. The QBCC uses its Standards and Tolerances Guide to help assess that. It’s basically the “yardstick” inspectors lean on when deciding whether work is defective or within tolerance.
Worth noting: a defect isn’t always dramatic. Some are quiet at first—water ingress, flashing issues, poor waterproofing. Then months later: mould, rotted framing, swollen skirting boards. That’s when it becomes a headache.
Structural vs non-structural: this split matters more than most people realise
Lot of people think a defect is a defect.
Queensland draws a line between structural and non-structural defects. Sounds technical, but it’s basically the difference between “this affects safety/usability” and “this is poor finish/workmanship”. And yep — the line matters because the time limits change.
Structural defects (the serious stuff)
These are the ones that affect safety, stability, or whether the building can be used properly.
Think:
- foundation movement that jams doors and windows
- significant cracking in load-bearing walls
- sagging beams
- unsafe balconies or railings
- major water penetration through the roof structure
- pool shell cracking that causes leaks
- fire safety breaches (like damage to fire-rated walls)
Non-structural defects (still annoying, just different)
These are often cosmetic or “workmanship” issues that don’t compromise the structure.
Think:
- paintwork that looks rushed
- uneven tiles (including trip hazards)
- doors that don’t close properly
- minor chipping
- gutters that sag or don’t flow well
Actually, let’s clarify that: “non-structural” doesn’t mean “ignore it”. It just means the system expects these issues to show up quickly and be dealt with quickly.
What to do first (before anyone starts quoting sections of the contract)
The biggest mistake? Going nuclear too early.
Not because you shouldn’t stand up for yourself—absolutely should—but because the process usually expects the builder/contractor to be given a fair chance to fix things first.
Before anyone lodges a complaint or starts talking tribunals, the simplest move is usually to give the builder a fair shot to fix it — but do it in a way that creates a paper trail.
A practical, sensible first step looks like this:
- Put it in writing. Email is fine. One defect per dot point, photos attached, and a clear “please confirm by ___ when you’ll attend to rectify.” Nothing dramatic. Just clear.
- Set a reasonable deadline (the source suggests around 14 days as a guide).
- Offer access for inspection/rectification.
- Follow any contract dispute steps if they exist.
Pro tip: keep the email calm. No insults. No threats. Just facts. The best email reads like it could be shown to an inspector or tribunal member without embarrassment.
And keep records of everything. Emails, texts, photos, dates, who said what. It feels tedious… until it’s the difference between “strong case” and “it’s your word against theirs”.
When the builder won’t play ball: QBCC is usually the next step
If the contractor refuses, delays endlessly, or does “repairs” that are basically a cover-up, the next step is often lodging a complaint with the QBCC.
The source suggests including:
- a clear description of the defect
- photos
- proof you gave the builder a chance to fix it
- copies of the contract, plans, specs (if you have them)
QBCC officers may try early resolution first—sometimes a nudge from the regulator gets movement. If not, an inspection can happen.
At inspection, the QBCC may assess against:
- the Building Code of Australia
- relevant Australian Standards
- the QBCC Standards and Tolerances Guide
- approved plans and contract specifications
If defects are found, the source notes the inspector usually issues a Direction to Rectify (DTR)—and commonly gives the builder 35 days to fix the work.
DTR ignored? That’s where consequences get real
This is where it gets interesting. Because a DTR isn’t a polite suggestion.
If a builder ignores it, the source notes the QBCC can escalate with penalties, including:
- fines for individuals (up to $41,725)
- fines for companies (up to $208,625)
- licence consequences (demerit points, conditions, suspension, cancellation)
- and public recording of non-compliance on licence search
Also, according to the source, the QBCC usually treats non-compliance seriously after the 35-day deadline passes.
So if you’re a homeowner thinking, “Nothing ever happens to builders,” Queensland’s system can actually be pretty tough—especially lately.
Time limits: the most brutal part of defective building disputes
Deadlines are the silent killer in these matters.
Miss them and it doesn’t matter how bad the workmanship is—you might lose the practical remedy you were counting on.
The source sets out QBCC enforcement time limits:
- Structural defects: QBCC can order repairs up to 6 years and 6 months after completion
- Non-structural defects: the limit is 12 months after completion
But wait, there’s more: owners have their own deadlines too. The source provides a table that (in summary) includes:
- structural: complaint within 12 months of discovering the defect, provided it arose within the 6y6m window; and home warranty scheme claims within 3 months of discovery
- non-structural: complaint within 12 months of practical completion; and home warranty scheme claims within 7 months of completion
This creates the classic tension: investigate properly, but move quickly.
Pro tip: don’t wait for the “perfect report” before taking any step if time is running out. Sometimes the best approach is to lodge, preserve rights, then keep investigating.
Negotiation fails? Here’s where QCAT and courts come in
Not every matter resolves with emails and inspections. Sometimes it stays polite. Sometimes it turns into the classic builder dispute stalemate: “not our fault”, “within tolerance”, “that’s maintenance”, “we’ll come back next month”… and next month never arrives.
When it can’t be sorted through the QBCC process or negotiation, QCAT is often where it lands. It’s meant to be more accessible than court — still serious, but less formal and usually cheaper to run.
But QCAT has limits. The source notes it generally deals with domestic building matters involving amounts up to $50,000, and larger matters may be heard if both parties agree—though that consent isn’t always given when the numbers get big.
For higher-value or complex matters, the courts come into play. The source sets out monetary ranges:
- Magistrates Court: up to $150,000
- District Court: $150,000 to $750,000
- Supreme Court: no limit
Courts can also deal with multi-party disputes (builders, subcontractors, consultants), injunction-type orders, and professional negligence claims against architects/engineers/certifiers.
Contracts: the “defects liability period” myth needs to die
A lot of people think once the defects liability period ends, that’s it. Builder’s off the hook.
Not necessarily.
That “defects liability period” in the contract? People treat it like a countdown to freedom for the builder. It isn’t always. It mostly governs how early snag items get handled after completion. Separate legal rights can still exist outside that window — depending on what the contract says and what the law allows.
Contracts also love a bit of self-protection: liability caps, exclusions, sneaky little time limits. Sometimes they work. Sometimes they don’t. And the frustrating part is you don’t really know which bucket you’re in until someone actually reads the clause properly in context.
You’d think it would be simpler. But building contracts love fine print.
Building a strong case (without accidentally making it worse)
A strong case is usually boring. It’s evidence and consistency.
The source recommends:
- photos from multiple angles
- careful records of communications
- copies of contracts, plans, inspection reports
- notes of relevant weather/events
- invoices for emergency repairs
Independent reports matter too—building inspectors, engineers, specialist consultants. Objective evidence beats emotion every time.
In these disputes, feelings don’t carry much weight. Evidence does. Photos, reports, dates, emails — the boring stuff wins.
After any phone call, send a quick “Just confirming our chat…” email. Not to be petty — just because once things get tense, everyone remembers the conversation differently.
Red flags where legal support becomes more important:
- denial of obvious defects
- demands for extra payment to fix poor work
- total communication breakdown
- multiple parties pointing fingers
And that’s where Commercial Litigation Lawyers can become relevant—not for the tiny cosmetic stuff, but when the dispute is serious, time-sensitive, or heading toward tribunal/court.
FAQ: questions people actually ask when the house is leaking
Should the builder be contacted before the QBCC?
Usually yes. The process commonly expects you to give the contractor a fair chance to fix defects first, ideally in writing with a clear deadline.
What’s a Direction to Rectify (DTR)?
It’s a QBCC direction telling a contractor to fix defective work. A Direction to Rectify (DTR) usually sets a timeframe for the builder to fix the work — the source notes it’s commonly 35 days. That date matters, because the next steps often hinge on whether the builder complies.
Structural vs non-structural: what’s the real difference?
Structural is the serious “safety/stability/usability” stuff. Non-structural is often finish/workmanship issues. Both matter — but the classification can change which deadlines apply.
What are the key time limits in Queensland?
The source notes QBCC enforcement can run up to 6 years 6 months for structural defects and 12 months for non-structural defects after completion, plus separate owner deadlines for complaints and home warranty scheme claims.
Is QCAT always the next step after QBCC?
Often, but it depends. The source notes owners generally must attempt QBCC dispute resolution before approaching QCAT, and QCAT’s monetary limits can affect whether the matter belongs there.
What if the dispute is bigger than $50,000?
This is where strategy changes. QCAT is often the go-to for domestic disputes, but the source notes it usually deals with amounts up to $50,000. Above that, it may need to move into the courts — unless both sides agree to QCAT dealing with a larger amount (and not everyone agrees when the stakes are high).
Neutral next step
If defects have appeared, the safest move is usually: document everything, notify the builder in writing, and check the deadlines before spending months arguing in circles. Once time limits are missed, “being right” doesn’t always help.
Legal disclaimer
This article is general information only and does not constitute legal advice. It does not take into account individual circumstances. For advice about your specific situation, get advice from a qualified Australian lawyer.
About the Creator
Dan Toombs